引黄灌溉济卫工程初步计划报告

来源 :新黄河 | 被引量 : 0次 | 上传用户:fonely
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
引黄工程目的有两个,一个是为了灌溉,计划浇溉新乡、获嘉、汲县和延津四县的农田约四十万亩。另一个是为了济卫,增加卫河水量,以增进新乡至天津间的航运。引水地点在京汉路黄河铁桥上游北岸,筑闸引水。总干渠从黄河边进水闸起至新乡卫河边止,共长五二公里,最大输水量为四○秒公方。西干渠自忠义车站南起至永康卫河边,长约三十公里。东干渠自小冀车站东北起至汲县卫河边,长亦约三十公里。两渠计划最大输水量为一四·○秒公方。灌溉区域在铁路以西者,南起忠义车站,北抵卫河边,西达获嘉城东,东至铁路边,灌田约计二○万亩。在铁路以东者,西起田庄,东到汲县城,南抵黄河废堤,北至卫河边,灌田亦约计二〇万亩.关于济卫航运方面,计划输入卫河水量一七·〇秒公方,使衛河經常保持二〇秒公方的水量,希望在河道整理以后,可以航行二〇〇噸汽船.全部工程費用據粗略估計需小麥三一五一萬市斤,計劃於一九五〇及五一兩年間完成.將來渠成之后,只灌溉一項,每年即可增產糧食小麥一四四〇萬市斤,及雜粮九九二万市斤,两年增益即可抵足工程费用.至于航运利益及渠道上水力与其他间接利益,还未计算在内. There are two purposes of the Yellow River Diversion Project, one for irrigation and the planning to irrigate about 400,000 mu of farmland in Xinxiang, Xujia, Ji County and Yanjin counties. The other is to Ji Wei, Wei River to increase the amount of water in order to promote the Xinxiang to Tianjin shipping. Diversion site in Beijing Han Road, the upper reaches of the Yellow River Iron Bridge north shore, building gates diversion. The main canal from the Yellow River into the lock until Xinxiang Wei River, a total length of two or two kilometers, the maximum water delivery of 40 seconds public square. West trunk from Zhongyi Station south to Yong Kang Wei River, about thirty kilometers. East Main Canal from Ji-Ji Station northeast to Ji County Wei River, also about thirty kilometers long. Two channels planned maximum water delivery of 14 ○ ○ seconds public square. Irrigated areas are west of the railway, from Chungli Station to the south, from the north to the Weihe River and west to the east and east of the railway. The irrigation area amounts to about 200,000 mu. To the east of the railway, from the west to the Grange, east to the Ji County, south to the Yellow River embankment, north Wei River, filling the field is also about 200000 acres.For Jiwei shipping, plans to enter the Wei River water seventeen 〇 second public square so that the Weihe often maintain 20 seconds of public water, hoped that after finishing the river, you can sail 200 tons of steamboat .According to a rough estimate of the total cost of 3.551 million pounds of wheat, planned to It will be completed in 1950 and 1982. After the irrigation canal project is completed in the future, only one irrigation project will be launched to increase the output of 140,400 kg of grain wheat and 992,000 kg of miscellaneous grains per year. The gain for two years As for the shipping interests and the hydraulic and other indirect benefits in the channel, it has not been taken into account.
其他文献
现行的水电部《电力建设施工及验收技术规范》(水轮发电机组篇,以下简称新规范)中对磁极接头有如下规定: “第182条磁极接头连接,应符合下列要求: 一、接头错位不应超过宽度
我所一室断裂机理课题组于今年五月完成了“二滩水电站地下厂房及连接隧道的三维边界元法分析”工作。二滩水电站地下厂房包括三个大的地下洞室(主厂房、主变室和调压室)和
在湖北省农村工作会议上,湖北省副省长郭有明要求全省各地落实安全责任,扎实做好森林防火工作。在春节前后,要集中排查安全隐患,落实安全责任,加强森林防火巡护,严格野外火源
乱档乱档是指同时挂上两个档。新出厂的拖拉机一般不会乱档。多数情况下,是因机手将拨叉轴盖板拆开清洗检查后,未装复互锁销而造成的。另外一个原因就是拨叉固定螺钉折断或
演员在塑造角色时如果能把人物的心理活动表现的透彻,那么表达流露出的感情肯定真实准确,会让人跟随剧情产生相同的感受,或悲伤或喜悦或兴奋或意外。表演就是需要演员去体验
汉江(也叫汉水、襄河),发源於陕西,流经鄂北,到汉口流入长江,全长约一千五百公里,流域面积一十七万四千平方公里,是我国长江干流的最大支流。汉江自马良以下流入平原,称为下
本文提出再热式汽轮机功频调节系统的非线性数学模型和状态空间方程,介绍用于判别系统稳定性和求解上述系统动态过程的ALGOL和BASIC计算程序粗框,分析PID调节器近似最佳参数
一、总述本文目的有二:(一)推导隧洞规范中所推荐的計算水工隧洞襯砌的公式;(二)討論這些公式的缺点,并建議更較精确的計算方法。在推导隧洞襯 I. General Overview The pu
电影的叙事模式与小说不同,是通过图像、声音、人物来构建起故事情节来进行叙事的,因此在小说改编电影的过程当中,电影编剧尤其需要对小说中情节进行画面化语言的表达,从而完
舞台灯光作为一种现代化的舞台表现形式其在舞台舞台艺术的性越来越突出和明显。随着现代科技的进步和发展越来越先进的灯具丰富和发展了灯光在舞台艺术中的表现形式。但是,