论文部分内容阅读
自2007年漫湾电厂接入集控以后,景洪、瑞丽江、小湾等电厂陆续接入澜沧江流域梯级电站集控中心,流域梯级水电站群开始逐步形成,梯级电站集控中心的经济价值和社会效益日显突出。随着电厂的增多,对集控中心运行安全性的要求也越来越高。结合澜沧江集控中心的自身特点,从软、硬件2个方面介绍了目前在集控日常运行中所采用的各项有特色的安全措施,为梯级电站集控中心建设提供参考。
Since Manwan Power Plant got access to Central Control in 2007, power plants such as Jinghong, Ruili River and Xiaowan successively access the centralized control center of the cascade hydropower stations in the Lancang River Basin. The cascade hydropower stations in the basin have been gradually formed. The economic value of the cascade control center Social benefits have become increasingly prominent. With the increase of power plants, the requirements for the operation and safety of centralized control center are also getting higher and higher. Combined with the own characteristics of Lancang CTC, this paper introduced various special safety measures adopted in daily operation of CIMC from two aspects of software and hardware, and provided references for the construction of CIMC.