当前,煤矿岩巷掘进中的装岩工作,普遍采用装载机直接将岩石卸入矿车。其装岩效率较低,劳动强度较大(用人力推车)。如果能配上转载机,便不仅可以提高装岩效率,而且可取消人工推车,从而可改善劳动条件。据目前国内情况,采用皮带转载机是行之有效的。皮带转载机的容量可按下式计算 Qz=Q_1+Q_1t_2/t_1式中 Qz——转载机容量; Q_1——装载机的生产率; t_1——装1辆矿车时间; t_2——过矿车间隔时间。 若矿车容积为V_1,则Q_1=V_1/t_1。 上式可看出,装载机的容量(Q_z)随着装车时间(t_1)减少而增大,随着过矿车间
At present, rock loading in coal rock tunneling work, commonly used loader to rock directly into the tub. Its rock loading efficiency is low, labor-intensive (with a human cart). If coupled with the repackaging machine, not only can improve rock loading efficiency, but also to eliminate the manual cart, which can improve working conditions. According to the current domestic situation, the use of belt loader is effective. The capacity of the belt transfer machine can be calculated as Qz = Q_1 + Q_1t_2 / t_1 where Qz - the capacity of the loader; Q_1 - the productivity of the loader; t_1 - the time of loading a tub; t_2 - Intervals. If the tub volume is V_1, then Q_1 = V_1 / t_1. The above equation shows that the capacity of the loader (Q_z) increases as the loading time (t_1) decreases. As the overburden