红水河岩滩水电站初步设计审查会于4月4日至20日在南宁举行,水电部水电总局与广西壮族自治区建委共同主持了这次会议。参加会议的有43个单位的代表和专业人员共130余人。会议分三个阶段进行:第一阶段为广西电力局勘测设计院的专业人员汇报设计情况;第二阶段赴坝址现场查勘;第三阶段分组讨论、大会发言并通过会议纪要。
The preliminary design review meeting of the Hongshuihe Yantan Hydropower Station was held in Nanning from April 4 to April 20, and the meeting was co-chaired by the Hydropower Administration of the Ministry of Mines and the Construction Commission of Guangxi Zhuang Autonomous Region. More than 130 representatives and professionals from 43 units attended the conference. The meeting is divided into three phases: the first phase reports to the professionals of Guangxi Survey and Design Institute about the design situation; the second phase goes to the site of dam site survey; the third phase of group discussion, the conference speaks and passes the minutes of the meeting.