论文部分内容阅读
由于蒲河流域四家子河段上游无水文站和雨量站的资料,根据辽宁省水文手册成果及图表查算,对蒲河流域上游的设计流量进行推求。
Due to the data of non-hydrological stations and rainfall stations in the upstream of the Shijiazi Section of Puhe River Basin, the design flow of the upstream of Puhe River Basin is deduced based on the results of Liaoning hydrological manuals and the charts.