英布鲁水电站坝基为胶结性差的软弱砂岩,透水性强,地下水和岩体电阻率高,且处于高雷暴区,降雨量大,土坝筑坝材料含水率高,电站远离负荷中心,电站在电网中要承担基荷、峰荷和调频等多项任务。以上不利的地质、水文、气候、筑坝材料和负荷特性要求,使电站设计面临着众多的技术难题。在设计过程中,通过对种种不利因素的分析、研究,制订了完整的处理方案,较好地解决了由此引起的众多技术问题,使工程成功建设并安全运行。
The dam foundation of Yingbula Hydropower Station is poorly cemented weak sandstone with high water permeability, high groundwater and rock resistivity, high thunderstorm area, heavy rainfall, high moisture content in earth dam construction materials, and away from load center, Grid to bear the base load, peak load and FM and many other tasks. The above unfavorable geological, hydrological, climatic, damming materials and load characteristics require that the power station design faces numerous technical problems. In the design process, through the analysis of various unfavorable factors, research and formulate a complete treatment program, a good solution to the many technical problems arising therefrom, so that the construction of a successful construction and safe operation.