介绍采用新技术、新工艺对乌鲁木齐石化总厂半再生式催化重整装置进行挖潜改造消除“瓶颈”的经验。该装置处理量由150kt/a扩大到200kt/a,通过3个月的运行考核和装置标定,证明扩能改造是成功的。装置投资回收期只有2个月。
This paper introduces the experience of using “new technology” and “new technology” to eliminate “bottleneck” in the semi-regenerative catalytic reforming unit of Urumqi Petrochemical Plant. The unit capacity increased from 150kt / a to 200kt / a, through 3 months of operational assessment and device calibration, proved that expansion is successful. Equipment investment payback period of only 2 months.