引黄济青工程是山东省最大的跨流域调水工程,全长253km,共有沉沙池1座,水库1座,泵站4座,倒虹36座,涵闸81座,桥梁247座。引黄济青工程在中途不设调节水库,实行等容量控制。在冬季调度运行中,要经常不断地对各个闸站上下游水位进行统计,并依此进行闸门开度的调节。浪费了大量的人力和物力,且时间滞后太长,缺乏一个整体的概念。闸站的自动化水平直接关系到引黄济青工程管理进一步提高,影响到冬季送水的远程科学调度。 经过1998~2001年全线的自动化安装成功,山东省引黄济青工程管理局建立了以济南为
Huangji Yellow River Project is the largest inter-basin water diversion project in Shandong Province with a total length of 253km. There are 1 sedimentation tanks, 1 reservoir, 4 pumping stations, 36 inverted inverters, 81 culverts and 247 bridges. Yin Huang Jiqing not adjust the project in the middle of the reservoir, the implementation of other capacity control. In the winter dispatching operation, it is necessary to constantly count the water levels of the upstream and downstream of each sluice station and adjust the opening of the sluice accordingly. Wasting a lot of manpower and material resources, and time lags too long, the lack of a holistic concept. The automation level of the gate station is directly related to the further improvement of the management of the Yellow River Diversion Project and the long-range science dispatch that affects the winter water supply. After 1998-2001, the automation of the entire line was successfully installed. The Yellow River Diversion Project Management Bureau of Shandong Province established a pilot project in Jinan