论文部分内容阅读
文章以某水库防渗加固工程为对象,在分析水库渗漏原因的基础上,对比选择最为适宜的施工方案,并对施工内容与质量控制进行详实论述。最终检验结果显示,坝体防渗加固后各项指标均符合设计标准,取得良好的应用效果。
Based on the analysis of the causes of seepage in reservoirs, the article chooses the most appropriate construction scheme and analyzes the construction content and quality control in detail. The final test results show that all the indexes of the dam after seepage prevention and reinforcement meet the design standards and achieved good application results.