通过现场调查和验证,找出影响混凝土精确控制的主要因素,并分析其产生的原因。针对上述主要影响因素,以BIM为平台,结合实际工程,制定对策,构建混凝土用量精确控制模型,实现高层建筑全生命周期混凝土用量的控制管理。
Through field investigation and verification, find out the main factors affecting the precise control of concrete, and analyze the causes. In view of the above main influencing factors, taking BIM as a platform, combined with the actual project to formulate countermeasures, the precise control model of concrete dosage is constructed to realize the control management of the concrete life-cycle of high-rise building.