【摘 要】
:
一、工程概况 临濮沙河水库是一座供山东省菏泽电厂用水的水库,最大库容536万m3,位于鄄城县境内的临濮沙河上,围坝长5207.3m,坝顶高程55.50m,最大坝高9.5m,一般坝高7.5m,坝
【机 构】
:
山东省水利工程总公司泰安灌浆公司,山东省水利工程总公司泰安灌浆公司
论文部分内容阅读
一、工程概况 临濮沙河水库是一座供山东省菏泽电厂用水的水库,最大库容536万m3,位于鄄城县境内的临濮沙河上,围坝长5207.3m,坝顶高程55.50m,最大坝高9.5m,一般坝高7.5m,坝顶宽6m,为均质土坝,上下游边坡均为1:3。坝前坡铺塑料膜防渗,塑料膜上用干砌石护坡,该坝于1990年冬修建,由于是冬季和群众
First, the project profile Pro Pu Shahe Reservoir is a reservoir for water heze power plant in Shandong Province, the largest storage capacity of 5360000 m3, located in Juancheng County in the Pu River, the dam is 5207.3m long, crest elevation 55.50m, the maximum dam It is 9.5m high, 7.5m high in general and 6m wide in crest. It is a homogeneous earth dam with 1: 3 upstream and downstream slopes. Pre-dam slope plastic membrane seepage, plastic masonry slope protection, the dam built in the winter of 1990, due to winter and the masses
其他文献
1国家监督抽查和重点企业检查结果及分析根据国家质量监督检验检疫总局((2008)国监任字第02022号产品质量国家监督抽查委托书和(2008)国监任字第04105号产品质量国家监督抽查
为了满足测斜仪检测需求,研制了一种由高精度步进电机、蜗轮副传动机构和高精度圆光栅构成的测斜仪自动校准系统。本文重点研究了系统的误差补偿方法,由于传统的基于最小二乘法
市政供热工程是一个非常复杂、繁琐的工程.为了获得工程建设的理想经济效益,有必要加强工程管理,明确工程各阶段成本控制的重点.从这些要点出发,采取合理的控制对策和措施,确
本标准适用于使用固体燃料的砖瓦工业轮窑.使用其他燃料的砖瓦工业轮窑可参照执行.rn本标准适用于使用固体燃料烧制以粘土,页岩、粉煤灰、煤矸石为原料的砖瓦的轮窑.
宿迁市位于江苏北部,地处亚热带向暖温带过渡地区,属暖温带季风区域大陆性气候.且为陇海、沿海和沿江经济带交叉辐射区,又处于三大经济带后发优势较为明显的地区.南依洪泽湖,
1 施工技术管理的意义 施工技术管理是对各项技术活动、技术工作以及与技术相关的各种生产要素进行计划、实施,总结和评价的系统管理活动,工程项目施工技术管理是施工企业技术管理活动在现场的延伸和具体化,它对建立正常的技术工作秩序,严格技术工作程序和责任制,保证施工质量和安全,提高施工效率,降低工程成本,增加经济效益都具有举足轻重的作用,通过计划和有序地对施工技术管理,可以保证施工过程遵循技术规律,尊重
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥