万家寨引黄入晋工程地处内陆深处 ,冬季气候寒冷 ,若引水线路中的水体结冰 ,将带来严重的经济损失。根据设计单位提供的工程资料 ,对引水工程中的总干线、南干线的沿线水温变化情况进行了计算分析 ,得出防止引水线路结冰的主要措施为 :①尽量保持引水线路内水体的高流量 ;②充分重视申同嘴水库这个温度“弱面” ,使水库处于一定流量的工作状态 ,严格控制停机时间 ,必要时可给水库加盖 ;③若万家寨水利枢纽取水口处水温低于 1.5℃ ,可采取加大水体流量的方法防止结冰
Wanjiazhai Yellow River diversion project is located in the interior of the deep, cold weather in winter, if the water line in the water freezing, will bring serious economic losses. According to the engineering data provided by the design unit, the water temperature changes along the main trunk line and the South Main Line of the diversion project are calculated and analyzed, and the main measures for preventing icing of the water diversion line are as follows: (1) Try to keep the high flow rate ; ② pay full attention to Shen Tongzui reservoir temperature “weakness”, the reservoir at a certain flow of working conditions, strict control of downtime, if necessary, can stamped the reservoir; ③ If the Wanjiazhai water intake intake temperature below 1.5 ℃, can be taken to increase the flow of water to prevent icing