垂直铺塑及其在堤基防渗处理中的应用

来源 :河南水利 | 被引量 : 0次 | 上传用户:zhangshihua11
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1前言2000年,双洎河流域范围内普降大到暴雨,降雨强度为近20年所罕见。双洎河河水猛涨,80多公里堤防险象环生,部分堤段决口。造成这种情况,固然因为洪水峰高量大,持续时间长,水位高,但与堤防本身存在基础渗漏、管涌等隐患亦有直接关系。目前,防止渗漏、管涌等事故,虽然早已在土坝设计中找到了有关的技术措施,但由于我国堤防线量大,经济上不允许照搬土坝工程的解决方法。垂直铺塑是解决堤基渗漏、管涌等 1 Foreword In 2000, the Shuangbahe River Basin ranged from heavy rain to heavy rainfall, which was rare for nearly 20 years. Shuangbahe River soared, more than 80 kilometers of embankment risk like a relic, part of the embankment burst. This situation is caused by the flood peak height, long duration and high water level, but it is also directly related to the embankment’s own leakage and piping. At present, to prevent leakage, piping and other accidents, although the relevant technical measures have been found in the design of earth dam, due to the large amount of embankments in our country, it is not allowed to follow the solution of earth dam project economically. Vertical shop is to solve leaking embankment, piping and so on
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
国务院办公厅于2002年9月17日以国办发[2002]45号文发布了《水利工程管理体制改革实施意见》(以下简称《实施意贝》),拉开了水利工程管理体制改革的序幕。2004年12月7日,河南
1洪水分析由于康山水库实测流量资料短缺,水文复核采用《河南省中小流域设计暴雨洪水图集》(1984年出版,以下简称“84图集”)提供数值进行计算。设计暴雨由“84图集”提供雨
1基本情况1.1前期工程情况唐白河干流防洪治理一期重点工程是南阳市重点工程项目之一,该项目从1996年开始筹划,通过规划、可行性研究、初步设计等阶段,于2004年4月由河南省水
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
开展重特大事故案例研究,可为重特大事故防范应对工作提供最直接有力的理论技术支撑.本文通过研究分析2013-2017年我国道路交通重大事故的特点和原因,并从加强对驾驶员和社会
期刊
1固结灌浆设计1.1灌浆目的为改善进水塔地基岩石的力学强度和变形模量,增强基岩的整体性,补强在结构开挖中形成的基岩损伤,设计要求对进水塔基础做固结灌浆处理。1.2灌浆孔布设
期刊
介绍采用潮喷混凝土加固边坡施工技术 Introduction to Construction Technology of Strengthening Slope with Tidal Sprayed Concrete