Evaluation and optimization of secondary water supply system renovation

来源 :Journal of Zhejiang University(Science A:An International Ap | 被引量 : 0次 | 上传用户:asergh12
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Due to pollution in second water supply system (SWSS),nine renovation alternative plans were proposed and com-prehensive evaluations of different plan based on Analytical Hierarchy Process (AHP) were presented in this paper. Comparisons of advantages and disadvantages among the plans of SWSS renovations provided solid foundation for selecting the most appro-priate plan for engineering projects. In addition,a mathematical model of the optimal combination of renovation plans has been set up and software Lingo was used to solve the model. As a case study,the paper analyzed 15 buildings in Tianjin City. After simulation of the SWSS renovation system,an optimal scheme was obtained,the result of which indicates that 10 out of those 15 buildings need be renovated in priority. The renovation plans selected for each building are the ones ranked higher in the com-prehensive analysis. The analysis revealed that the optimal scheme,compared with two other randomly calculated ones,increased the percentage of service population by 19.6% and 13.6% respectively,which significantly improved social and economical benefits. Due to pollution in second water supply system (SWSS), nine renovation alternative plans were proposed and com-prehensive evaluations of different plan based on Analytical Hierarchy Process (AHP) were presented in this paper. Comparisons of advantages and disadvantages among the plans of SWSS renovations provided solid foundation for selecting the most appro-priate plan for engineering projects. In addition, a mathematical model of the optimal combination of building plans has been set up and software Lingo was used to solve the model. As a case study, the paper analyzed 15 buildings in Tianjin City. After simulation of the SWSS renovation system, an optimal scheme was obtained, the result of which indicates that 10 out of those 15 buildings need be renovated in priority. higher in the com-prehensive analysis. The analysis revealed that the optimal scheme, compared with two other randomly assigned ones, increased the perc entage of service population by 19.6% and 13.6% respectively, which significantly improved social and economical benefits.
其他文献
1982年,Binning和Rohrer研制成世界上第一台扫描隧道显微镜STM(Scanning TunelingMicroscope),是目前唯一具有原子级分辨率的实空间成像技术,当这两位科学家用STM观察到高序石墨表面原子的图像时,人们对微观世界的认 In 1982, Binni
施工企业市场营销是现代企业经营中的核心职能和关键活动,是企业生存与发展的带有战略性的重要内容,是充分了解、分析建筑市场发展的需求,即从工程项目信息的获得,到公关、
京城大厦48、28和26层楼面防水采用辽宁盘锦新型防水材料厂用滚压成型水冷新工艺生产的MEE-4型改性氧化沥青油毡。这种油毡是用改性氧化沥青和3层聚乙烯塑料薄膜滚压而成的,
“上课!”我一个箭步跳上讲台。“老师好!”全班同学都睁大了眼睛看着我。他们肯定没有想到,新来的“老班”居然身手这样敏捷地出现在他们面前。 “Class!” I jumped into
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
期刊
假日里,我来到奉化的溪口游玩。那儿的一道道风景让我流连忘返,难以忘怀。那儿的山是一道风景线。一路上,山势陡峭,弯特别多!到了山顶,我俯视群山,只见山路犹如一条巨龙盘踞
“多味书屋”栏目为小朋友们提供了一个交流读书(也包括影视等其他类别的作品)体会的平台,所谓“奇文共欣赏,疑义相与析”,很受欢迎,来稿也特别踊跃。本期“多味书屋”栏目刊
该项技术为捷克的维什科夫化学技术研究所的专利技术。先用常规方法燃烧废催化剂,燃烧所得产物灰渣在有氧化剂存在的条件下,以盐酸溶液来革取回收把,盐酸溶液的浓度为28%~36%。把铁
周末,我和妈妈跟着旅游团一起去海边玩。经过一路的颠簸,我们终于来到了目的地——长岛。长岛是一个四面环海的小岛。站在海边远远望去,天连着海,海连着天,天水一色,一望无际
为了尽快促使双辊式带钢直接连铸工艺达到工业化大生产水平,UsinorSacilor和ThyseenStahl公司共同承担开发“Myosotis”项目。在开发过程中,不断解决各种技术问题。例如钢水的