工程网络计划以其工作时间的逻辑关系清晰,关键工程与非关键工作的区别明显,工作的时间参数标注齐全或推算简单,利用电算技术修改方便,可以充分利用时差,有利于工程进度的控制和管理等显著特点,在大中型工程的施工管理中较传统的横道图计划显示出了巨大的优越性。现阶段在工程建设的进度控制中是否应用工程网络计划技术,已成为衡量一个施工企业管理水平高低的标志之一。
The engineering network plan has a clear logical relationship with its working time. The difference between the key project and the non-critical work is obvious. The time parameter of the work is marked or calculated simply, and the modification by the computer technology is convenient. The time difference can be fully utilized, which is in favor of the project schedule control And management of the salient features of the construction of large and medium-sized projects in the more traditional cross-sectional plan shows great advantages. Whether engineering network planning technology is applied in the progress control of project construction at this stage has become one of the hallmarks of measuring the management level of a construction enterprise.