0.概述昆明火车站(主站房)工程,地下一层地上九层,该工程从二层以上分东西两栋,两楼间净距为31.8米,在屋面层以上设计的钢网架造型横跨东西两楼,气势磅礴。主站房的热水供应热源为太阳能,平板型太阳能集热板
0. Overview Kunming Railway Station (main station) project, the ground floor of the ground floor of the nine floors, the project from the second floor above two East and West, the distance between the two floors is 31.8 meters, above the roof layer designed steel grid Styling across the east and west floors, magnificent. The hot water supply source of the main station room is solar energy, flat type solar collector board