由水电部杭州机械设计研究所设计、上海水工机械厂制造的 4m 硬岩屈进机于1987年2月在上海水工机械厂召开现场评议会后,当年年底落实在由水电部五局二分局施工的引黄济青引水工程中使用。设备于88年5月陆续到达工地,经过我所有关工程技术人员及上海水工机械厂工人师傅二个多月的紧张安装、调试,于7月11日初装完毕,此后在作设计工况下,用自行式方案,将整机推进100多 m 到达作业面,在洞口
Designed by the Hangzhou Mechanical Design Institute of the Ministry of Water Resources and Hydropower Engineering, the 4m hard rock flexure machine manufactured by Shanghai Hydraulic Machinery Factory convened an on-site council at Shanghai Hydraulic Machinery Factory in February 1987, Branch of the Yellow River Jiqing diversion project. Equipment in May 1988 one after another to reach the site, after all my engineering and technical personnel and Shanghai Hydraulic Machinery Factory workers more than two months of tense installation, commissioning, at the beginning of July 11 finished, then for design conditions Under the self-use program, the whole machine to promote more than 100 m to reach the work surface at the hole