论文部分内容阅读
2009年3月至6月,承担国家文物局大遗址保护项目的陕西省考古研究院秦直道考古队,为配合国家青(岛)兰(州)高速公路建设,对全国重点文物保护单位秦直道遗址陕西富县桦沟口段进行了考古发掘。考古调查、钻探、发掘、回填历时92天,此后几年又陆续对秦直道进行了发掘和钻探。一、秦直道简况秦直道始修于秦始皇三十五年(前212年),《史记·蒙恬列传》载:“始皇欲游
From March to June 2009, the Shaanxi Provincial Institute of Archeology Qin Zhidao Archeology Team, which undertakes the protection of major sites of the State Administration of Cultural Heritage, coordinated with the construction of the Qinghai (State) Lanzhou Expressway on National Qinghai Island, The ruins of Fuxian County, Shaanxi Province, carried out archaeological excavations. Archeological surveys, drilling, excavation and backfill lasted 92 days. After that, several excavations and drilling of the Qin Straits were carried out successively. First, the Qin Straight Profile Qin Straight Road was first revised in thirty-five years before Qin Shi Huang (212 years ago), ”Historical Records Meng Tian Biography" contains: