论文部分内容阅读
项目名称:墨臣石灯胡同办公楼项目改造项目地点:北京设计团队:北京墨臣建筑设计事务所建筑面积:700m~2设计时间:2012完工时间:2013城市的发展是一个不断更新和变化的竖向生长过程,在这种新旧交替的过程中,如何对待现存的旧建筑成为了亟需解决的问题。如何在现有条件限制下为旧建筑注入新元素,使其焕发新的生命力,完成旧建筑的蜕变与新生成为近阶段的热点课题。墨臣在此时机迎来了石灯胡同9号院的改造设计工作。
Project Name: Modus Stone Light Hutong Office Building Project Redevelopment Project Location: Beijing Design Team: Beijing Moonsun Architects Floor Area: 700m ~ 2 Design Date: 2012 Completion: 2013 The development of the city is an ever-changing and changing Vertical growth process, in this new and old process, how to treat existing old buildings has become an urgent problem to be solved. How to infuse new elements into the old buildings under the existing conditions so as to rejuvenate them and accomplish the transformation and rejuvenation of old buildings are the hot topics in the recent stage. Mo Chen ushered in the Shek light alley on the 9th hospital reform design work.