论文部分内容阅读
先扼要介绍江口水电站地质结构特点,进而论述寒武系地层岩石(体)风化和所形成的全、强风化槽及其工程处理措施。
At first, the characteristics of geological structure of Jiangkou Hydropower Station are briefly introduced, then the rock and body weathering of Cambrian stratigraphy and the complete and strong weathering troughs formed and their engineering treatment measures are discussed.