吴堂水库除险加固工程设计

来源 :河南水利与南水北调 | 被引量 : 0次 | 上传用户:effielove0228
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
吴堂水库为均质土坝,此次除险加固针对水库现状及安全评价中存在的主要问题,上游坝坡采用混凝土衬砌,坝体设置深层水泥土搅拌桩防渗墙的加固方案,解决了坝体渗漏安全问题,溢洪道浇筑混凝土宽顶堰控制水流,并增设消力墩等消能工,解决了泄洪安全问题,输水洞进口重建竖井式闸室,解决引水灌溉问题,除险加固后,消除了多年的安全隐患,水库发挥了工程效益。 Wu Tang Reservoir as a homogeneous earth dam, the reinforcement of the current situation and safety evaluation of the reservoir for the existence of the main problems, the upstream dam slope with concrete lining, dam body set deep cement mixing pile impervious wall reinforcement program to solve Dam seepage safety issues, spillway pouring concrete wide crested weir control water flow, and the addition of dissipating pier and other energy dissipators, to solve the safety problems of flood discharge, import and rebuild water shaft tunnel shaft chamber to solve the problem of diversion irrigation, reinforcement After eliminating many years of security risks, the reservoir has played a project efficiency.
其他文献
胫骨干骨折治疗的方法较多,各具特点;交锁髓内钉作为一种髓内固定,它具有手术创伤小、固定坚强、骨折愈合率高、能锁。早期活动、并发症少等优点。它适用范围广,甚至在GustiloⅢ
随着城市建设的高速发展,一些新型的建筑产品不断涌现。预应力管桩因其具有高强度、抗弯性好、有较强的穿透力、施工机械化程度高、综合经济效益好等一系列优点,而被广泛应用
近几年,由于科学技术发展以及社会的进步,使得高层建筑钢筋混凝土后浇带施工技术取得了很大进展。文章作者结合自身多年实践经验,重点对高层建筑钢筋混凝土后浇带施工技术加以深
盘县白河沟水利工程坝址河道较宽,两岸地形坡度较陡,经过初步设计阶段论证大坝采用混凝土面板堆石坝,泄洪建筑物采用泄洪洞+溢洪道联合泄洪,施工图设计阶段,对混凝土面板堆石
蒙江冗各水电站位于贵州南部罗甸县境内,蒙江流域冗各河段。坝址右岸边坡高陡,高达90m左右。边坡结构为顺向坡,岩层倾角小于坡角。边坡岩体强溶蚀风化带内顺层泥化夹层发育,且卸荷裂隙发育,是潜在的不稳定边坡,现状处于稳定状态,但在大坝基坑开挖切脚,炮震可能造成边坡失稳。
双层呼吸式玻璃幕墙施工在保持建筑幕墙透明性的同时,大大提高了围护结构的保温隔热性能,节约了运营的能耗,符合节能设计标准,值得推广施工应用。
施工组织设计是在施工过程中实行科学管理的重要部分,为此必须重视施工组织设计。进一步优化组织,是确定合理报价的措施。在投标过程中施工组织设计是确定投标报价的关键。
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
分析了COS水解催化剂失活的原因,给出了再生处理流程,对失活的、再生后的和国内新鲜催化剂在不同温度和空速下进行了活性对比试验,并介绍了工业试生产及工业应用过程.
随着“轻装修,重装饰”设计理念的逐步深入,大众在室内装修时都开始格外重视软装饰。于是室内设计中的软装饰这个概念也就应运而生,并且越来越得到人们的重视并加以研究。本文开