500千伏糯扎渡电站出线工程共有Ⅰ、Ⅱ、Ⅲ回线路,Ⅰ、Ⅱ回为同塔双回,Ⅲ回为单回路,共计铁塔108基。Ⅰ、Ⅱ回线路连接到±800千伏普洱换流站,Ⅲ回线路连接到思茅开关站,线路架设长度为80.6千米。工程于2011年3月29日开工建设,是糯扎渡电站的配套送出工程,担负着“西电东送”、“云电外送”的任务,Ⅲ回线路已于8月8日投产,Ⅰ、Ⅱ回线路预计明年6月投产。随着工程投产,将糯扎渡电站电力送至普
The 500 kV Nuozhadu Hydropower Station has Ⅰ, Ⅱ and Ⅲ lines, and Ⅰ and Ⅱ back to the same tower double loop, Ⅲ back to a single loop, a total of 108 base tower. Ⅰ, Ⅱ back to the line ± 800 kV Pu’er converter station, Ⅲ back to the Simao switch line circuit station, the line erection length of 80.6 km. The project started construction on March 29, 2011. It is the matching project of Nuozhadu Hydropower Station and is responsible for the task of “sending power from west to east” and “sending out cloud power” Put into operation on the 8th, Ⅰ, Ⅱ back to the line is expected to put into operation next June. With the project put into operation, the Nuozhadu power station will be sent to Pu