论文部分内容阅读
建筑工地临时供电设计是施工总体规划的组成部分,是施工现场“三通一平”的重要内容之一,也是组织文明施工的一个基本条件。如何简化其计算,对及时做好施工前准备工作,节约能源,确保连续施工和缩短工期,有一定的现实意义。一、用电量的确定建筑工地临时供电,包括施工及照明用电两个方面,其用电量常用计算法如下:
The temporary power supply design of the construction site is an integral part of the overall construction plan. It is one of the important contents of the “three links and one leveling” of the construction site and is also a basic condition for the organization of civilized construction. How to simplify its calculations has certain practical significance for the timely preparation of pre-construction work, saving energy, ensuring continuous construction and shortening the construction period. First, the determination of electricity consumption Temporary power supply at the construction site, including construction and lighting electricity in two aspects, the calculation method for electricity consumption is as follows: