论文部分内容阅读
设计阶段对铁路投资控制所占比重最大,通过分析投资失控的原因,如设计深度不足、管理体制不健全等,提出了加强概预算基础资料的收集、控制设计过程、推行限额设计、引进设计监理等方面的措施,来实现铁路基本建设工程的投资有效控制。
In the design stage, the investment control of railway is the most important part. By analyzing the causes of the uncontrolled investment, such as the insufficient design depth and the imperfect management system, the paper proposes to strengthen the process of collecting and controlling the basic data of budget, to implement the quota design and to introduce the design supervision And other measures to achieve the railway infrastructure projects effectively control the investment.