论文部分内容阅读
上海宝山钢铁总厂长江引水工程,是由取水、蓄水、输水及供电通讯等项目组成。本文介绍的出水管钢平台,是取水工程中的一部分。一、出水管钢平台组成出水管钢平台位于吸水泵房与水库前抛石棱体之间,为便于水上泵房沉井施工,借助6根出水钢管搭设一临时工作平台,作为沉井施工的水上基地,其上布置施工道路、工具间、水泵房、空压机间、电工变压站等设施。
The Yangtze River Water Diversion Project of Shanghai Baoshan Iron and Steel Works is composed of items such as water intake, water storage, water supply, and power supply communication. The water pipe steel platform introduced in this paper is part of the water intake project. I. Outlet pipe steel platform The outfall pipe steel platform is located between the suction pump room and the front of the reservoir. In order to facilitate the caisson construction of the water pumping house, a temporary working platform is set up with the six outlet water pipes to serve as caisson construction. Water bases are equipped with facilities such as construction roads, tool rooms, pump rooms, air compressor rooms, and electrical transformer stations.