针对北仑发电厂二期 6 0 0MW锅炉一次风系统和磨煤机存在的问题 ,从运行、试验和改造等方面进行了分析和探讨 ,介绍了处理方法和效果
Aiming at the problems existing in the primary air system and pulverizer of the 600MW boiler in the second stage of Beilun Power Plant, the paper analyzes and discusses the operation, test and reconstruction, and introduces the treatment methods and effects