论文部分内容阅读
化学灌浆现场质量管理与控制是水电站施工的难点,文章以锦屏一级水电站为例针对F2断层及层间挤压错动带地质缺陷,提出加强现场质量管理控制的方法,以便为与锦屏一级电站同等或近似地质条件下的电站施工提供参考。
Chemical grouting on-site quality management and control is the difficulty of construction of hydropower station. Taking Jinping I Hydropower Station as an example, aiming at the geological defects of F2 fault and interlaminar extrusion fault zone, The first-level power station provides the reference for power station construction under the same or similar geological conditions.