矿区平面控制网的测设在矿山建設中占着一个重要的地位。控制网测设的好坏,关系着矿山各项测量工作和矿山建設工作是否能順利进行。矿山建設一般是經历地质勘探、勘察設計、基本建设,最后是生产时期。由于各个时期对测量精度要求不同,对如何作好矿区控制网的技术设计、正确适当的布设矿区控制网是应当给以必要重视的。东川自1951年到1959年中,前后进行了为数巨大的平面控制的測设工作,从时间和要求上来看,我们大体可分为三个时期,即地质勘探、勘察設計和基本建設三个时期的布网。由于各个时期服务对象不同,测量单位較多,彼此缺乏联系,因而在矿区中作了三次較大规模的布网;在控制测量中投下了很大的力量。勘探初期(1951年)在矿区进行了第一次控制网的测設,当时只考虑满足初期地质勘探需要,同时又缺乏
The measurement and control of mine flat control network occupies an important position in mine construction. Control network measuring set is good or bad, the relationship between the mine measurement work and mine construction work can be carried out smoothly. Mine construction is generally experienced geological exploration, survey and design, capital construction, and finally the production period. Due to the different requirements of measurement accuracy in different periods, it is necessary to pay attention to how to make the technical design of the mine control network properly and to properly and properly set up the mine control network. From 1951 to 1959, Dongchuan carried out surveying and mapping work for a great number of plane controls. According to the time and requirements, we can roughly be divided into three periods: geological exploration, survey and design, and capital construction Period of cloth network. Due to the different service objects in different periods, the unit of measurement is large and there is a lack of contact with each other. Therefore, three large-scale cloth networks were made in the mining area and a great deal of effort was put into the control measurement. During the initial exploration (1951), the survey of the first control network was carried out in the mine area, at the time only considering the need of initial geological exploration and lacking