工业厂房常用长柱明牛腿全装配方案,与现浇柱相比,有机械化程度高、工期短、用工少、劳动强度低、大大节省模板及支撑费用、吊装机械可在跨内开行、设备容易选择等优点。而现浇柱在每层接头处,钢筋需错位绑扎,一般下层柱主筋要向里收进1d,或接近1d (当柱只有4根主筋时,接近收进1d。d 表示主筋的直径),以便把上层主筋配在设计要求的位置上,与下层柱伸出的主筋绑扎,这对柱的受力来说是很不利的,特别是当柱的断面较小、配筋较粗的情况下,在主筋收进的部位,断面受到较多的削弱。
The full assembly scheme of long columns and bull legs is commonly used in industrial plants. Compared with cast-in-place columns, it has a high degree of mechanization, short construction period, less labor, low labor intensity, significant savings in formwork and support costs, and hoisting machinery can be used to cross the line and equipment. Easy to choose and other advantages. In-situ columns at each joint, the steel bars need to be misplaced. Generally, the main bars of the lower column are to be retracted inward for 1d, or nearly 1d (when the column has only 4 main bars, it is close to 1d. d indicates the diameter of the main bars). In order to match the upper main ribs to the design requirements and to tie up the main ribs protruding from the lower column, this is very unfavorable to the force of the columns, especially when the columns have small sections and thick reinforcements. In the area where the main tendons enter, the sections are weakened more.