与单纯的施工进度计划管理不同,由于EPC总承包范围的扩大,EPC计划不仅仅单纯的反映图纸、设备交货时间和施工进度计划,在设备方面更进一步的深入到设备制造、集港、海运、清关及内陆运输等各个环节,在设计方面,已经深入到初设审查、施工图审查等各个环节,E、P环节与C环节高度结合,本文从结合自身工作经验阐述电力建设EPC项目计划管理的规划措施和方案。
Different from the simple construction schedule management, due to the expansion of the EPC general contracting scope, the EPC plan not only simply reflects the blueprint, equipment delivery time and construction schedule, but also goes deep into the equipment manufacturing, port-gathering and shipping , Customs clearance and inland transportation and other aspects, in the design, has been in-depth review to the initial review, construction drawing review and other links, E, P links and C links highly integrated with the experience of this paper elaborated on the power construction EPC project Management planning measures and programs.