丹江口枢纽河床混凝土坝的基础是分二期开挖的,第一期是右岸1—18块,总的开挖面积为3万平方公尺,共开挖石方9(?),600公方。58年11月开挖砂卵石,12月开挖石方,在开挖过程中碰到不不少的困难:有宽达30公尺岩性较弱的破碎带的交汇区;也有坚硬的强度达2,000公斤/平方公分的大块火成岩。这样在不同的岩石性质和不同的工作条件下依靠党的领导和群众的智慧,按照设计要求,克服困难出色地完成了任务。我们的开挖标准:“岩石新鲜完整,形状平缓”
Danjiangkou junction riverbed concrete dam foundation is divided into two phases of excavation, the first phase of the right bank 1-18 block, the total excavation area of 30,000 square meters, a total of excavation stone 9 (?), 600 square meters . Sand and gravel were excavated in November 58 and rock excavation in December. There were quite a few difficulties encountered in the excavation process: there was a crossing area of crushed rock with a width of 30 meters and a weak lithology; and also hard strength Large igneous rock up to 2,000 kg / sq cm. In this way, under different rock types and different working conditions, they have accomplished their task well by relying on the leadership of the Party and the wisdom of the masses in accordance with the design requirements and overcoming difficulties. Our standard of excavation: “rock fresh and complete, gentle shape”