大禹渡引黄电灌站二级泵站其地形扬程192.7米,装机24台,总装机容量为16,320千瓦,是国内较高扬程的扬水站.该站自1974年投入运行以来,情况一直良好,几年来充分发挥了灌溉效益.现将我们在大禹渡高扬程二级泵站的设计及运行中的一些经验和体会介绍如下。
Dayudu Yellow River Irrigation Station Pump Station II has a top elevation of 192.7 meters and installed capacity of 24 units with a total installed capacity of 16,320 kilowatts and is a pumping station with a higher lift in China since the station was put into operation in 1974. The situation has been good, Give full play to the irrigation benefits over the past few years.Now we are in Dayu Ferry High Pump Station II design and operation of some of the experience and experience described below.