中建五局施工的沈丹客专锦江山隧道,全称为沈丹客专TJ—3标项目部六工区锦江山隧道,全长4605米,是中建五局在建的最长的城市山岭隧道,也是中建总公司在建的最长铁路隧道。沈丹锦江山隧道项目的管理工作从开工起,无论巨细,都显得卓尔不群,很快就征服了挑剔的业主。2010年7月,业主代表、身兼盘营线、京沈线、沈丹线三个高铁工程的总经理田利民到工地检查工作,一路上赞不绝口,连说了三个“非常好”:
Construction of the five sets of construction Shen Danke special jinshan tunnel, all called Shen Danke special project TJ-3 standard project six work area Jin Jiangshan tunnel, a total length of 4605 meters, is the construction of five in the longest city built mountain tunnel, is also in Build the longest railway tunnel under construction. Shen Danjin Jiangshan tunnel project management started from the start, regardless of size, are extraordinary, quickly conquered the discerning owners. In July 2010, Tian Limin, the owner’s representative and the general manager of the three high-speed railways including Panying Line, Beijing-Shenyang Line and Shenyang-Dan Line, went to the construction site for inspection and was praised all the way. Even the three “Very Good ”: