根据厦门港西港区的自然条件,按平面比尺λ_L=500,垂直比尺μλ_H=60进行东波二期工程各有关方案的整体模型试验。结合现场地形、泥沙资料,对港区泥沙冲淤及其发展趋势做了初步探讨。并提出了减少港区泥沙淤积的工程措施。
According to the natural conditions of the port area of Xiamen Port, the overall model tests of various plans of the East Wave II Project are carried out according to the plane scale λ_L = 500 and the vertical scale μλ_H = 60. Combined with the site topography and sediment data, this paper makes a preliminary study on sediment deposition and its development trends in the port area. And proposed engineering measures to reduce silt in the port area.