针对某钢铁公司3#、4#步进梁式加热炉节能改造工程,对施工过程中出现的问题进行分析,确定了改造工程中加热炉的设计拆除界线范围与实际施工拆除界线,对各种设备安装过程中出现的问题进行探讨。
For a steel company 3 #, 4 # walking beam heating furnace energy-saving renovation project, the construction process of the problems occurred in the analysis to determine the reconstruction project heating furnace design and removal of the scope of the demolition of the actual construction of the line of dismantling, Equipment installation process problems to be explored.