论文部分内容阅读
全油田已进入高含水开发后期 ,稳产难度较大。 2 0 0 0年局里要求三厂 72 .5×1 0 4 t硬稳定 ,开发形势比较紧张。我们对文卫马油田开发中存在问题及潜力进行了分析 ,对老井进行了复查。我们对文卫马古油田交界处老井 ,结合地质构造 ,邻近油水井情况 ,井距 ,以及完井试油措施过程中每一点细节进行深入分析 ,以便找出试油结果不理想真正原因 ,以求获得滚动勘探新突破。油田滚动开发大有可为。
All oil fields have entered the late development of high water content, stable production is more difficult. In 2000, the bureau requested that the third plant 72.5 × 1.04 t be hard and stable, and the development situation is rather tense. We analyzed the problems and potentials in the development of Weimar Oilfield and reviewed the old wells. We conducted an in-depth analysis of the old well at the junction of Wenwei and Magu oilfields, combining the geological structure, the conditions of adjacent oil and water wells, the well spacing, and every detail of the completion test oil test in order to find out the real reason for unsatisfactory test results, In order to obtain new breakthrough rolling exploration. Oilfield rolling promising.