到“九五”末.陕西省25个电气化县全部通过验收,其中10个县提前1年或2年达标。5年间新开工水电装机42万kW,投产18.3万kW,使“八五”末水电装机实现了翻番。水力资源开发程度也由12%提高到24%,居西北之首。水电效益由“八五”末年产值7926万元增长到现在的2亿元。“九五”期间完成水电建设资金26亿元,其中财政资金仅占3.4%,社会办电已成为全省水
At the end of the “Ninth Five-Year Plan” period, all 25 electrification counties in Shaanxi Province passed the inspection and acceptance, and 10 of the counties reached the standard one or two years in advance. During the five-year period, new hydropower capacity of 420,000 kW was started and 183,000 kW was put into operation, doubling the installed capacity of hydropower at the end of the 8th Five-Year Plan. The development of hydraulic resources has also increased from 12% to 24%, ranking first in the northwest. The hydropower benefit has grown from the 79.26 million yuan output value of the “Eighth Five Year Plan” to the current 200 million yuan. During the “Ninth Five-Year Plan” period, 2.6 billion yuan of hydropower construction funds were completed, of which only 3.4% were fiscal funds. Socially operated electricity has become the province’s water