论文部分内容阅读
介绍了万家寨引黄工程地面泵站出水压力平洞和竖井的工程主要设计概况、工程主要施工情况、混凝土质量全面复测情况,阐述了混凝土裂缝与渗漏原因分析,最后对缺陷处理措施进行了探讨.
Introduced Wanjiazhai Yellow River Diversion Project ground pumping station Pingdu and shaft pressure of the main design of the project, the main construction conditions, the full re-measurement of concrete quality situation, described the reasons for the cracks and leakage of concrete, and finally the defect treatment measures Discussed.