第一公司的全体职工从一九五八年起就承担着国家重点工程之一的四、五部炉建设任务。这项工程是我国自己设计自己施工的,是一项设计要求严格、机械设备多、规模大、技术结构复杂的现代化装置工程。其中机动设备就有424台,金属结构所需用的钢材达四千一百五十多吨,工艺管线长达五万二千四百多米,混凝士量五万一千一百五十九米~3,土方工程量为一百一十多万米~3,输电线路长这五万多米。建设这样一个技术复杂的工程,对我们来说是一个严重的考验,任务是很难巨的,摆在我们面前的困难是很多的。但是公司全体职工在党的社全主义建设总路线的光辉照耀下,在党的正确领导下,发挥了高度的积极性和创造性,以排山倒海之势,作出了过去人们认为不能作到的事
Since 1958, all employees of the first company have assumed the task of building four or five boilers, one of the key national projects. This project is our country to design their own construction, is a strict design requirements, mechanical equipment, large-scale, complex technology structure of modern installations. Of these, there were 424 mobile devices, with 4,150 tons of steel required for metal structures, 52,400 meters of process lines and 51,150 concrete mixers Nine meters ~ 3, earthwork volume of more than 1.1 million meters ~ 3, transmission lines long this more than 50,000 meters. The construction of such a technically complex project is a serious test for us. The task is very difficult. The difficulties before us are many. However, with the brilliant leadership of the party’s overall line of socialist construction, all staff and workers of the company have given full play to their enthusiasm and creativity under the correct leadership of the party, and have made things that people thought they could not do in the past