【摘 要】
:
日本至1961年底,电站总装机容量为2,595万瓩,仅次于美、苏、英而占世界第四位。共中水电站装机为1,350万瓩(占总装机的52%),仅次于美、加、苏,亦为世界第四位。日本在水电建
论文部分内容阅读
日本至1961年底,电站总装机容量为2,595万瓩,仅次于美、苏、英而占世界第四位。共中水电站装机为1,350万瓩(占总装机的52%),仅次于美、加、苏,亦为世界第四位。日本在水电建设方面,有很多特点与我国相似,现就其一次结线方面的设计情况作如下综合介绍,以供参考。
In Japan, by the end of 1961, the total installed capacity of power plants was 25,950,000 tons, ranking the fourth in the world after the United States, the Soviet Union and the United Kingdom. The total installed capacity of Zhongshui Hydropower Station is 13,500,000 tons (52% of the total installed capacity), second only to the United States, Canada and the Soviet Union, ranking the fourth in the world. In terms of hydropower construction, Japan has many characteristics similar to those in our country. We hereby make the following comprehensive introduction on the design of the junction in the first instance for reference.
其他文献
众所周知,在传统的立武水轮发电机组安装工艺中,机组各固定部件中心的调整是以某个部件(如座环)为基准件,利用求心器和重锤挂钢琴线作为机组中心线,再以此中心线调整其他部
目的构建国槐Sophora japonica种胚愈伤组织培养体系,并对愈伤组织中的异黄酮量进行初步分析。方法通过添加不同浓度不同种类的植物生长调节剂,得到国槐种胚愈伤组织诱导、悬
我省已建大、中、小型水库5,000余座,内河堤防1,000多公里,由于勘测、设计、施工、管理、运用、老化等原因,不少工程潜伏着多种隐患,致使工程效益不能充分发挥,管理部门迫切
成功地设计和建造一座土坝,迄今仍然是一种科学,也可以说是一种技艺.土力学当然是一种强有力的武器,它具有实验科学的全部特征.但是,土力学在设计中的应用不过是应用简化模
告别短缺经济,国民的消费行为变得谨慎起来,令商家普遍感到生意难做。如何把生意做“火”,成为时下众多生意人苦思冥想的一个问题。做活生意的诀窍,无非是摸准顾客的消费心
本文利用铜街子两个典型重力坝段,五种荷载组合的应力模型试验成果,探讨了岩基中存在缓倾角断、夹层及相互切割条件下,岩基的应力、变形特性及其对大坝的影响。
In this pap
大化水电站是红水河中游的一座低水头水电站,坝址位于广西壮族自治区都安县大化公社附近,集水面积112,200公里~2。坝址下游27公里设有都安水文站,集水面积113,500公里~2。该
Language transfer is a very important phenomenon in second language acquisition(SLA), which many linguists and psychologists would like to research. People who
在苏联的灌溉事业中,机电提水灌溉占有很重要的地位.苏联也是世界上发展排灌泵站较早的几个国家之一,早在1886年,莫斯科就出现了第一座带离心泵的电力灌溉泵站.1932~1935年,
《水工隧洞设计规范SD134-84》(以下简称(《规范》),现已正式出版。这个《规范》是以1966年水利电力部(66)水电技字第39号文颁发的《水工隧洞设计暂行规范》为依据,并在总结