论文部分内容阅读
漯河车站在减速顶安装及使用近25年、微机可控顶调速系统安装使用18年中,对漯河车站调车作业效率的提高和运输安全畅通方面发挥了十分积极的作用,不但大大减轻了工人的劳动强度,也节约了大量运营成本的支出。
Over the past 25 years, Luohe Station installed and used decelerating tops for nearly 25 years. During the 18 years of installation and use of computer-controlled roof speed control systems, it has played a very active role in improving the shunting operation efficiency and transportation safety in Luohe Station. The labor intensity of workers also saved a lot of operating costs.