论文部分内容阅读
简要回顾了泰和变电站220 kV G IS设备的LCC建模和计算结果,并核算了该工程的实际发生成本,对LCC计算进行了验证。验证结论表明,原先的LCC计算结果和工程实际成本相近,工程成本得到了很好的控制。
The LCC modeling and calculation results of 220 kV G IS equipment in Taihe Substation are briefly reviewed. The actual cost of the project is calculated and the LCC calculation is verified. The verification results show that the original LCC calculation results are similar to the actual project cost, and the project cost is well controlled.