论文部分内容阅读
W-100 1/2挖掘机减速机,原来是装配工作中笨重体力劳动最大的一个部件,平均每装一台需用十八磅大锤打百十下。不仅效率低,而且容易发生质量、安全事故,成为装配工作中的一个薄弱环节。 1976年,我们在毛主席一系列最新指示精神鼓舞下,坚决抵制了“四人帮”的干扰,在一机部第一设计院的帮助下,高举“鞍钢宪法”伟大红旗,破除迷信,解放思想,因陋就
The W-100 1/2 excavator reducer used to be the largest part of the bulky physical work in the assembly work. On average, each loader needs to use an 18-pound sledgehammer to hit a hundred. It is not only inefficient, but also prone to quality and safety accidents. It is a weak link in the assembly work. In 1976, under the encouragement of a series of latest instructions from Chairman Mao, we resolutely resisted the interference of the “Gang of Four”. With the help of the No. 1 Design Institute of the Ministry of Machine Building, we held high the “Anshan Iron and Steel Constitution” banner and broke the superstition and emancipated the mind. Because of