山西鲁能河曲发电有限公司为国家“西电东送”北通道首批开工建设项目之一,属煤电一体化项目,规划容量4×600MW和4×1000MW机组。一期工程为2×600MW国产亚临界湿冷燃煤发电机组,由山东鲁能集团有限公司、山西晋能集团有限公司、山西国际电力集团公司分别按60%、30%、10%的投资比例合资建设,于2002年8月20日开工建设,2004年11月投产
Shanxi Lunenghequ Power Generation Co., Ltd. is one of the first construction projects under the state’s “West to East” North Pole Project. It is a coal-electricity integration project with planned capacity of 4 × 600MW and 4 × 1000MW units. The first phase of the project is 2 × 600MW domestic subcritical wet and cold coal-fired generating units. The project is jointly invested by Shandong Luneng Group Co., Ltd., Shanxi Jinneng Group Co., Ltd. and Shanxi International Power Group Corporation with 60%, 30% and 10% respectively , Started construction on August 20, 2002 and put into operation in November 2004