论文部分内容阅读
房屋整体平移是一项复杂的技术,本文介绍了一座 60m ×11.6m四层砖混办公楼,在不破坏房屋整体结构及造型的条件下,将其整体纵向平移8.5m的设计方法。文中对平移机构中各组成部分,包括轨道梁、新旧基础、水平力施加体系等进行了详细分析。
The whole house translation is a complex technology. This paper introduces a design method of a whole building with 60m × 11.6m four-storey brick mixed-use office building, which will make the overall longitudinal displacement of 8.5m without damaging the overall structure and shape of the house. In this paper, the various components of the translation mechanism, including the track beam, the old and the new foundation, the horizontal force application system were analyzed in detail.