WDST型调速器为双微机电液调速器 ,DKST型为伺服电机控制的全可编程调速器 ;这两种调速器均为长江控制设备研究所产品 ,已在三门峡水电厂的 7台机组 (单机容量为 5 0MW和 70MW)中运行多年。通过运行实践和现场试验并经对比分析证明 ,这两种类型的调速器均能满足水电厂的运行需要 ;但从高可靠性运行及调整维护工作的要求看 ,以DKST 15 0型调速器更具优越性。 The WDST governor is a dual-microcomputer electro-hydraulic governor and the DKST is a fully programmable governor controlled by a servo motor. Both governors are manufactured by the Changjiang Control Equipment Institute and have been installed in the Sanmenxia Hydropower Plant at 7 Taiwan units (stand-alone capacity of 50MW and 70MW) run for many years. Through the operation practice and field test and the comparative analysis proved that both types of governor can meet the operational requirements of hydropower plants; but from the requirements of high reliability operation and adjustment and maintenance work, the DKST 15 0 speed More advantages of the device.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
二滩水电站主体工程共分 3个标段 ,其中Ⅱ标包括第一、二副厂房及主厂房内的土建和辅助机电设备 ,金属结构安装 ;Ⅲ标为主机、主变等主要机电设备安装。二滩水电工程公司为工
将人性化服务运用于手术室整体护理中,使患者心里负担减轻,焦虑成度降低,在心里、生理方面均获得满足感和安全感,对手术充满信心,可避免或减少并发症,提高手术质量.……
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
二滩水电站水轮机埋件及导水机构由GE公司制造 ,安装工艺由GE公司制定。埋件主要部件均为分瓣件 ,需现场组焊 ,埋件材质多为含碳量较高的高强钢 ,厚度大 ,焊接时对线能量、焊
二滩水电站 5 0 0kVGIS现场试验除进行了常规的工频耐压外 ,还进行了标准不推荐的操作冲击波耐压试验。工频耐压和操作冲击波耐压试验具有较强的互补性 ,操作冲击波耐压试验
2004年12月24日,水利部副部长敬正书代表部党组在全国水利厅局长会议上作总结讲话时强调,以科学发展观统领各项水利工作,全面提高水行政管理能力,认真解决好水利工作中的热点
:二滩水电厂自行研究开发了DAS ,并于1999年 4月投入使用。DAS实现了从上位机采集实时特征数据 ,并作为历史数据长期保存在数据库中 ,提供了通过数学模型分析特征数据直观反
具有行蓄洪区的复杂河道的洪水演算是洪水预报中的一个难点.对于复杂河道如何在水文学方法中考虑分洪、蓄洪并提高实时洪水预报的精度是一个重要的问题.为了解决这一难题,在