论文部分内容阅读
水建工程中钢筋混凝土原材料质量控制是施工过程中重要的一步。文章对钢筋混凝土出现质量问题的主要问题原因进行分析,认为主要原因主要集中在混凝土部分和钢筋部分,在此基础上,对水建工程中钢筋混凝土控制的要点进行归纳,要加强工程监控,原材料的质量控制和施工过程中的质量控制。希望对水建工程中实际的施工提供指导和借鉴意义。
The quality control of reinforced concrete raw materials in water projects is an important step in the construction process. The article analyzes the main problems of the quality problems of reinforced concrete. The main reasons are mainly concentrated in the concrete part and the reinforced part. On this basis, the key points of the reinforced concrete control in the water-construction project are summarized. It is necessary to strengthen the monitoring and control of raw materials Quality control and quality control during construction. Hope that the actual construction of water projects provide guidance and reference.