论文部分内容阅读
1960~1961年,上海地区新建了一批相当数量的装配式钢筋混凝土结构的多层厂房,其中有四幢厂房采用了装配式无梁楼盖结构。这四幢厂房的结构安装工作是由上海市机械施工公司担任的。我们曾与该公司协同对装配式多层厂房的施工进行了初步调查研究。兹将有关无梁结构多层厂房安装中的若干情况加以介绍,以供有关部门参考和讨
From 1960 to 1961, a number of multi-storey factory buildings with a prefabricated reinforced concrete structure were built in the Shanghai area, and four of them were equipped with a fabricated beamless floor structure. The structural installation work of these four plants was performed by Shanghai Mechanical Construction Company. We have worked with the company on a preliminary investigation of the construction of a multi-storey factory building. We will introduce some cases relating to the installation of non-beam structural multi-storey workshops for reference and discussion by relevant departments.