论文部分内容阅读
河南省永城电厂规划容量4×300兆瓦,经国家有关部门评审,该项目经济效益较好。厂址位于年产原煤1005万吨的河南省永城矿区,距矿区原煤集配站仅4公里,该电厂属于标准的坑口电站。在河南省永城矿区建设大型坑口火电机组,有以下优势:1.改善了能源的运输方式,减轻了煤炭的
The planned capacity of the Yongcheng Power Plant in Henan Province is 4×300 MW, which has been reviewed by the relevant state departments and the economic benefits of the project are good. The site is located in the Yongcheng Mining Area of Henan Province with an annual output of 10.05 million tons of coal. It is only 4 kilometers away from the original coal gathering and distribution station of the mining area. This power plant belongs to the standard Hangkou Power Station. The construction of a large-scale coal-fired power plant in the Yongcheng mining area in Henan Province has the following advantages: 1. Improved energy transportation and reduced coal