论文部分内容阅读
公路工程实施计划在现实工作中的核心是此工程中的测量和支付的步骤,这两个步骤也作为协议两方在合同里的关键条款,更作为工程监督人员检查治理工程的重要方法,同时也是乙方索取酬劳的仅有方式,所以,进行公路工程中的计量与支付工作可以为确认承包商给项目创造的真正效用做前期准备工作。此文基于此背景,针对此工作给出了较详细的描述,目的是更深刻地阐述工程测量和支付这两个步骤在项目成本的测定、工作水平的确保、工作进程的掌握等方面中所扮演的关键角色。
The core of the highway project implementation plan in the real work is the measurement and payment steps in this project. These two steps are also the key terms in the contract between the two parties and serve as an important method for the project supervisor to inspect the governance project. Meanwhile, It is also the only way for Party B to obtain remuneration. Therefore, carrying out metrology and payment in highway engineering can provide preparatory work for confirming the true effectiveness of contractors in creating projects. Based on this background, this article gives a more detailed description of this work, the purpose is to more profoundly expound the engineering measurement and payment of these two steps in the project cost determination, the assurance of the level of work, the work process master and so on Play a key role.